Friday, 30 October 2009
Friday, 23 October 2009
Production. Friday 23rd October
Today we completed Adam's video and moved onto Sam's video.
We chose to do this video in the room that we filmed mine and Declan's video. So this meant there was a lot of re-arranging furniture again.
We got to work as quick as possible though, finishing the first scene before packing up.
We chose to do this video in the room that we filmed mine and Declan's video. So this meant there was a lot of re-arranging furniture again.
We got to work as quick as possible though, finishing the first scene before packing up.
Tuesday, 20 October 2009
Production Tuesday 20th October
Today we completed my video of the doctor's appointment. A few outtakes but went well most of the time.
We also decided that we were going to do Adam's production next and chose a room to do it in and set up the equipment in there, except the camera in which we left in the locker in the teacher's room.
We also decided that we were going to do Adam's production next and chose a room to do it in and set up the equipment in there, except the camera in which we left in the locker in the teacher's room.
Wednesday, 14 October 2009
Diary. Wednesday 14th October
Today we learnt the hard way that leaving the camera in the room that we left it in was a bad idea as it could get stolen.
The teacher shouted at us for a good ten minutes.
The teacher shouted at us for a good ten minutes.
Monday, 12 October 2009
Production. Monday 12th October
Today we started production on my video.
We had to move the furniture around in the room and change some of the background which cost us a lot of time during our lessons. So we set the camera up and put it on charge. We did one scene which was the first scene where Sam opens the door and sits down (which a necessary part in the production).
We then left the camera on charge and locked the door for the next day.
We had to move the furniture around in the room and change some of the background which cost us a lot of time during our lessons. So we set the camera up and put it on charge. We did one scene which was the first scene where Sam opens the door and sits down (which a necessary part in the production).
We then left the camera on charge and locked the door for the next day.
Friday, 9 October 2009
Production. Friday 9th September
Today we completed Declan's video production.
During his production we had to change some of the scenes as we found some equipment to add to his video. These items were a lamp and a recorder.
We will start production on my video next Monday.
During his production we had to change some of the scenes as we found some equipment to add to his video. These items were a lamp and a recorder.
We will start production on my video next Monday.
Wednesday, 7 October 2009
Diary. Tuesday 7th October
I havn't had the internet at hom for a while for personel reasons so this is the first post in about two weeks.
Basically over the last two weeks we have started production on Declan's video in a room chosen by one of our teachers. We have had many outtakes as sam could'nt stop laughing so we have had to re-do many scenes. We have nearly completed his video and will be moving onto my one next.
We have chosen to do my production in the same room but we we will have to move the furniture around and some of the stuff in the background to make sure that the set looks different.
Basically over the last two weeks we have started production on Declan's video in a room chosen by one of our teachers. We have had many outtakes as sam could'nt stop laughing so we have had to re-do many scenes. We have nearly completed his video and will be moving onto my one next.
We have chosen to do my production in the same room but we we will have to move the furniture around and some of the stuff in the background to make sure that the set looks different.